|
S No. | QTY | DESCRIPTION | 1. | 1 | 4130 mtrs long Ropeway (In 2nd stage) with payload of 200 Kgs. for DDC Mandi Parishad. | 2. | 1 | 5500 mtrs long Ropeway with payload of 200 Kgs. for DDC Mandi Parishad. | 3. | 3 | 1500 - 5000 mtrs long Ropeways for J.K. PWD. | 4. | 1 | 2400 mtrs long Ropeway for 70 Engrs. Kargil. | 5. | 2 | 6 tons capacity Ropeways for WIL Pvt. Ltd. to construct a Hydro Project in H.P. | 6. | 1 | 300 mtrs. Ropeway for Rock Fall Protection Project, Nepal | 7. | 1 | Material Cum Passenger Ropeway for 7 Engrs. Indian Army, J&K | 8. | 1 | 6 ton Capacity Double Reversible Cable Crane for Pahwagarh, Gujrat | List of installations with Hydro Power projects S No. | YEAR | QTY | DESCRIPTION | 1. | 1992-94 | 2 | 5 tonne capacity and 85 tonnes/hour Ropeways at Ranjit Sagar Dam Project, Pathankot. | 2. | 1995-96 | 1 | 1 tonne bucket capacity, 2 tonne hook load and 400 mtrs long Cable Crane in Himachal. | 3. | 1996-99 | 1 | Major components for a 13 km long Mono-cable Ropeway for M/s Diamond Cements. | 4. | 2001 | 1 | 500 mtrs long Ropeway for HPSEB Kafnoo (HP). | 5. | 2002 | 1 | 2 tonne hook load/4 passenger cum material Ropeway for Hanuman Ganga Project in Uttarakhand. | 6. | 2003 | 1 | 2 tonne payload, 600 mtrs long Ropeway in Samot, Distt. Chamba (HP). | 7. | 2005 | 1 | 1.5 km long, 2 tonne hook load, material cum passenger Ropeway for Regency Aquaelectro and Motel Resorts Ltd. In Manali (H.P) | 8. | 2005 | 1 | 1.5 Mt bucket load, 600 mtr. long Material Ropeway for Lanco Infratech Ltd. Dharamshala. | 9. | 2005 | 1 | 1.5 Mt bucket load, 950 mtrs long material Ropeway for Lanco Infratech Ltd. | 10. | 2006 | 1 | 1.5 Mt bucket load, 750 mtr. long material Ropeway for Lanco Infratech Ltd. Dharamshala. | 11. | 2006 | 1 | 2000 Kgs. hook load, material Ropeway for Astha Hydro Projects (India) Ltd. Palampur (H.P.) | 12. | 2007 | 1 | 2 Mt bucket load, 350 mtrs long for AT Hydro (Chamba) | 13. | 2007 | 1 | 2 Mt bucket load, 550 mtrs long material Ropeway for Tejas Sarnika Hydro Energies (P) Ltd. Terella (Chamba) H.P. | 14. | 2007 | 1 | 2 Mt. bucket load, 700 mtrs long Cargo Ropeway for Anubhav Hydel Power (P) Ltd, Palampur. | 15. | 2008 | 1 | 2 Mt. 500 Mtr. Long Motorized ropeway for Regent Hydro (P) Ltd. Kinnaur (H.P.) | 16. | 2008 | 1 | 2 Mt. gravity Ropeway for Lanco Infratech (Budhil) H.P. | 17. | 2008 | 1 | Up-gradation of 1500 mtrs long cargo Ropeway from 2 Mt. to 4 Mt. for Regency Aqua-electro & Motel Resorts. | 18. | 2008 | 1 | 200 mtrs long river-crossing cargo/passenger Ropeway for Sorang HEP (H.P.) | 19. | 2009 | 1 | Maintenance of 3 tonne cargo Ropeway at Kinnaur (H.P.) | 20. | 2010 | 1 | 5 Mt. hook load capacity cargo Ropeway for Maytas-NCCSSJV in Kinnaur, H.P. | 21. | 2012 | 1 | 10 Mt. Cable Crane for laying penstock pipes for 100 MW Sorang Hydro Power Project (NCC Infrastructures) in Kinnaur, H.P. | 22. | 2013 | 2 | 4 Mt. cargo Ropeway at an inclination of 45 degrees for Kut Hydro, Kinnaur, H.P. |    List of installations with State Governments S No. | YEAR | QTY | DESCRIPTION | 1. | 2000 | 4 | Ropeways with a span of 1000-1350 mtrs, for HPPWD. | 2. | 2000 | 4 | River-crossing Ropeways of 250 mtrs span in H.P. | 3. | 2000 | 1 | Ropeway for HPPWD Karcham Division (HP). | 4. | 2002 | 1 | 8 passengers Vertical Lift at Auli (Uttarakhand). | 5. | 2002 | 1 | 1000 mtrs. long Ropeway for Mandi Parishad, (Uttarakhand). | 6. | 2003 | 1 | Monocable Ropeway, 5103 metre long with multiple buckets for Mandi Parishad, Uttarakhand. | 7. | 2004 | 1 | 1350 mtrs long Ropeway for HPPWD | 8. | 2004 | 1 | Mono-cable Ropeway of 6417 mtrs with multiple buckets for Mandi Parishad, Uttarakhand. | 9. | 2005 | 1 | 835 mtrs. long Ropeway for Mandi Parishad, Uttarakhand. | 10. | 2005 | 1 | 354 mtrs. long Ropeway for Mandi Parishad, Uttarakhand. | 11. | 2005 | 1 | 1250 Mtrs. long Ropeway for Mandi Parishad, (Uttarakhand) | 12. | 2006 | 1 | 1500 mtrs long Ropeway for HPPWD (Barua) Karcham. | 13. | 2007 | 2 | 1200 mtrs long gravity Ropeways for GMVN. | 14. | 2007 | 1 | 600 Mtr. Long Cargo Ropeway for H.P.P.W.D. Kinnaur | 15. | 2008 | 1 | 3 km long cargo Ropeway for Mandi Parishad, Uttarakhand. | 16. | 2009 | 3 | Gravity Ropeways for GMVN Uttarakhand. | 17. | 2009 | 2 | 1100 and 1300 mtrs long material Ropeway for I.I.T Roorkee (AHEC) in Distt. Chamoli & Bageshwar. | 18. | 2009 | 1 | Maintenance of 1500 mtr. Long ropeway in Kinnaur. | 19. | 2010 | 1 | 1500 mtrs. Long ropeway for rural development with Mandi Parishad, Uttarakhand. | 20. | 2011 | 3 | 1000 mtrs long gravity Ropeways for KMVN. | 21. | 2011 | 3 | 300 - 600 mtrs long river-crossing Ropeways with payload of 200 kgs/2 persons each for Mandi Parishad, Uttarakhand. | 22. | 2011 | 2 | 800 - 900 mtrs long gravity Ropeways for DDC Mandi Parishad (Agro) Dehradun. | 23. | 2016 | 1 | JV Project with Italian Company for supply & installation of 5 kms long Ropeway for restoration of a Monastery in Bhutan. | 24. | 2016 | 1 | 1300 mrs long Ropeway for J&K PWD |    List of installations with the Indian Defence S No. | YEAR | QTY | DESCRIPTION | 1. | 1999 | 2 | 1000 mtrs long Mono-cable Ropeways to an Engineer Regiment of the Indian Army. | 2. | 2000 | 1 | 900 mtrs long Ropeway to an Engineer Regiment. | 3. | 2002 | 3 | 600-1200 mtrs long Ropeways for the Army. | 4. | 2002 | 1 | 1 tonne capacity 250 mtrs long river-crossing Ropeway for the Army. | 5. | 2002 | 2 | 1050-1250 mtrs long Ropeways for the Indian Army. | 6. | 2003 | 1 | 2.5 tonne, 150 mtrs long Ropeway across river Nubra (Ladakh) for the Army. | 7. | 2003 | 4 | 1100 to 1700 meter long Ropeways for 9 Engineer Regiment, Kargil. | 8. | 2004 | 1 | 250 mtrs long river-crossing Ropeway for 63 Eng. Regiment, Sikkim. | 9. | 2004 | 1 | 1000 mtrs long Ropeway for 9 Eng. Regiment, Kargil. | 10. | 2005 | 1 | 2200 mtrs long Ropeway for ITBP 4th Batalion Kullu for Samdho. | 11. | 2006 | 2 | 800 mtrs & 1350 mtrs long Bi-cable Ropeway for 108 Engineer Regiment. | 12. | 2007 | 1 | 1800 mtrs long Bi-cable Ropeway for 108 Engineers. | 13. | 2008 | 1 | 1500 mtrs long Bi-cable Ropeway for 8 Engineers. | 14. | 2009 | 4 | Ropeway maintenance job in Northern Army Sector. | 15. | 2011 | 2 | 800 & 1500 mtrs long Ropeway for 111 Engineer Regiment (Indian Army). | 16. | 2012 | 1 | 400 mtrs long Surface Lift for Passengers with High Altitude Warfare School, Gulmarg. | 17. | 2013 | 1 | River Crossing Ropeway for 14 Engineers. | 18. | 2014 | 1 | 900 mtrs long motorized Ropeway for 52 Engineers. | 19. | 2014 | 2 | Motorized river-crossing Ropeways for 4 Engineers. | 20. | 2015 | 1 | 500 mtrs long Ropeway for 8 Engineers. | 21. | 2015 | 3 | Passenger Ropeways with 6 persons Cabin / 2 Ton Pay Load supplied in Nepal under the initiative of our Honb’l Prime Minister Mr. Narendra Modi. |  |